| Omtec Pop Up Strips may be any length. The number of pop ups on a strip may be varied and, located on any center lines desired. The minimum center line is 2 inches (50.8mm).
The air in feed line is a single 0.180 I.D. X 0.265 O.D. polyurethane tube under the strip between the first and last ball (double tube for Pop Up Ball Transfers and Pop Up Pad combination strips).
The standard in feed tube supplied is 8 inches (203mm) long attached between the first and second ball, but can be any length or location on the strip desired.
Omtec has FRL kits, non detented foot valve kits and detented toggle hand valve kits available.
Virtually any air control device may operate Omtec Pop Up Strips. In the majority of applications simple non-electric foot and hand valves are used. Omtec pop up units use very low air volume, it is usually not a consideration. Each up and down cycle of one ball uses .00038 cubic feet (.0000108 cubic meter).
If needed sensing device operation using electric solenoids valves may be used, control kits are available. |